Kitchen fitting labour cost in the UK: what the fitter charges on its own
If you have bought the units and just need someone to fit them, the labour is its own line on the bill. Kitchen fitting can be priced as a day rate, a fixed job price, or split across a fitter, plumber and electrician. The real prices on this page come from actual jobs, so you can see what fitting alone tends to run to once the units themselves are already paid for.
The quick version
- Fitting labour is separate from the units and is often quoted on its own once you supply the kitchen yourself.
- A full fit usually pulls in more than one trade, so plumbing and electrics can sit outside the fitter's price entirely.
- Labour attracts 20% VAT when your fitter is VAT registered, so always ask whether the quote includes it or not.
- Removing and disposing of the old kitchen is real work and is not always folded into the headline figure.
- A day rate multiplied by a guessed number of days is not the same as a fixed price for the whole job, and the two carry different risks for you.
- The gap between the cheapest and most expensive fit on this page usually comes down to how much of the room had to change, not how many cupboards were hung.
What people actually paid
Real prices, in people's own words
- £2,000“His bill was around £2k”
- £2,000“His bill was around £2k”
- £3,300“I recently paid £3300 for rip out and install.”
- £3,300“I recently paid £3300 for rip out and install”
- £4,500“£3,439 kitchen fitter + £625 electrician + £500 plasterer. So that's about £4,500.”
- £10,000“a Wickes flat pack kitchen which cost just under £4000 totalled just under £10,000 all in”
Genuine amounts posted publicly. We publish the price and the quote, never the person.
Why the price varies so much
Fitting time depends on how much has to happen, not just how many cupboards there are. A straight swap where the layout stays the same is quick, because the pipework and cabling are already in the right place. Once the sink moves, walls need making good, or the floor has to be levelled, the days add up fast. Complex worktops such as stone or solid wood often need a separate template and fit visit, which is another cost on top of the cabinet work. The condition of the room matters too, because dodgy old wiring or plumbing has to be brought up to scratch before anything new goes in. Who you hire changes the shape of the price as well. A sole trader working alone, a small local firm, and a larger fitted-kitchen company all price differently, and a bigger outfit often has more overhead built into the day rate than an individual working for themselves. Region plays a part too, since labour costs more where the cost of living is higher and less in areas with more fitters competing for the same jobs. A full kitchen normally needs a plumber and a qualified electrician alongside the fitter, so what looks like one price can actually be three trades stitched together. The distance between buying the units and having them fitted and finished is where budgets slip.
How to pay less
- Have the room clear, the old kitchen stripped out and any rubbish gone before the fitter starts, so you are not paying trade rates for donkey work.
- Keep the layout the same to avoid paying for new plumbing and electrical runs, which is one of the biggest single drivers of extra cost.
- Ask for three written quotes that break out fitter, plumber and electrician separately so you can see each element and compare like for like.
- Book the trades in the right order so nobody is stood waiting for someone else to finish, which can end up on your bill as downtime.
- Get a fixed price rather than an open day rate wherever you can, and get it in writing with what it covers listed out.
- Ask a sole trader whether they are VAT registered before you compare their quote against a bigger company's, since a like-for-like price can look cheaper purely because VAT is not being added.
Common questions
Is kitchen fitting priced per day or per job?
Both are common. Some fitters give a day rate and estimate how many days the job needs, others quote a fixed price for the whole fit. A fixed price gives you more certainty, but make sure it lists exactly what is covered, including worktops, appliance connection and making good, so extra days do not creep onto the bill.
Does the fitting price include plumbing and electrics?
Often not. Many fitters handle the cabinets and worktops, then bring in a plumber and a qualified electrician for the sink, appliances and any wiring. Those trades may be inside the quote or billed separately, so confirm which before you sign anything, and ask to see each trade's figure rather than one combined total.
Should I pay VAT on kitchen fitting labour?
If your fitter is VAT registered, yes, labour carries 20% VAT just like the materials. A sole trader below the threshold may not charge it, which can make their quote look lower even if the underlying work is priced the same. Either way, ask whether the number you have been quoted already includes VAT so you are comparing quotes fairly.
Why do quotes for what seems like the same job vary so much?
The units themselves are only part of the story. What drives the labour figure is how much the room has to change: whether the sink and appliances stay put, whether the floor is level, whether the walls behind the old units are sound. Two kitchens the same size can take very different amounts of time to fit, and the quote follows the time, not the floor area.
Is it cheaper to hire one fitter to manage everything or find each trade myself?
A single fitter managing the plumber and electrician for you saves you the hassle of coordinating three diaries, but you are usually paying a bit extra for that coordination. Finding and booking each trade yourself can work out cheaper, provided you are confident scheduling them in the right order so nobody turns up before the last person has finished.
What should I ask before accepting a kitchen fitting quote?
Ask whether the price is fixed or a day rate estimate, whether VAT is included, whether plumbing and electrics are covered or billed separately, and who is responsible for removing and disposing of the old kitchen. Get the answer in writing rather than a verbal assurance, since that is what protects you if the job runs long or extra work turns up once the old units come out.